car air filter PU GLUE
Usage:
1.The material must be full rocked after each to the plastic injection machine plastic injection so that the A material mixing evenly.
1.Everytime the plastic injection machine plastic injection A material must be full before the shaking in order to the material until
2.AB material proportioning ratio of A:B=100:25 or 4:1.28°C,you can start operation
3.Material temperature controlled 24°C-28°C appropriate then you can start operation.
4. Must be clean before using the mould release agent (Note:
The new plastic mould can be wiped free)
5 .If A and B is not reaction please measuring A and B ratio.
6. A and B must be sealed to .To avoid the air and water vapor reaction, as a result affecting the effect of colloidal
Attention:
1. The products are generally stored in a dry room, and pay attention to water, moisture and sun. Must cover the plug and cover, to avoid absorbing rubber moisture in the air, affect the results
2. Mould must be painted in front of the mould release agent,to be poured glue dry before.
3. A.B glue in ordinary temperature of 25 °C properly used, if the temperature is too high or too low will affect the use effect. You must use artificial methods of cooling or heating.